大倾角塔柱施工过程分析控制 被引量:2

Analysis of great dip tower's construction
下载PDF
导出
摘要 介绍了大倾角塔柱施工过程中的特点,采用液压爬模系统加主动支撑被动撑结合的方式,使塔柱施工过程处于安全状态。利用有限元软件MIDAS对上地斜拉桥桥塔建立了平面分析模型,计算不同工况下塔柱各部分应力,从而确定主动撑具体位置、施顶力;通过局部验算确定主动撑具体尺寸,保证塔柱施工的安全。 Introduced the characteristics of the big dip pylon’s construction process,apply climbing formwork system and active strut passive strut combined mode to save the pylon construction process.In this paper,apply the finite element software MIDAS to establish the flat model to analyze the pylon of cable-stayed bridge,calculated under different conditions pylon stress to determine the location and prestressed force on the active strut,by partial checking to determine the specific size of active strut in order to ensure the safety of the construction of the tower column.
作者 王吉翀 Wang Jichong(Design and Research Institute of Civil Engineering and Architecture,Dalian University of Technology,Dalian 116024,China)
出处 《山西建筑》 2019年第9期92-93,共2页 Shanxi Architecture
关键词 大倾角 塔柱 主动撑 施工控制 爬模 big dip pylon calculate active strut construction control climbing formwork
  • 相关文献

参考文献2

二级参考文献1

共引文献4

同被引文献18

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部