顶推施工中纵向水平临时连接施工技术

On longitudinal horizontal temporary joint construction technique in pushing construction
下载PDF
导出
摘要 针对于大吨位预应力连续梁整体顶推施工过程中水平连接采用刚性结构进行连接,再结合跨蓝烟铁路特大桥5×20 m预应力混凝土连续梁整体顶推施工特点,介绍了水平连接中采用软连接来消除顶推过程中对墩身产生的不利工况,通过该工程的成功实施,为顶推施工中水平连接采用简单、快速安装拆卸的软连接的临时设施施工提供一种可行的施工方法和思路。 According to the joint with the rigid structure for the horizontal connection in the overall pushing of large-tonnage prestressed continuous beam,the paper combines the overall pushing construction features of 5×20 m prestressed concrete continuous beam along Lancun-Yantai Station,introduces the adoption of the soft connection can be adopted to eliminate its unfavorable construction in the horizontal connection,and points out the feasible construction methods and ideas for the temporary construction of the soft connection featured with simple and fast installation in the horizontal connection in the pushing construction.
作者 屈晓力 Qu Xiaoli(The Fourth Engineering Co.,Ltd.of China Railway First Group,Xianyang 712000,China)
出处 《山西建筑》 2019年第9期178-180,共3页 Shanxi Architecture
关键词 设计 顶推施工 连续梁 design pushing construction continuous beam installation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部