期刊文献+

尾矿浆体高海拔U型管道输送工程应用实践

Application Practice of U-type Pipeline Transportation of Tailings Slurry at High Altitude
下载PDF
导出
摘要 通过对钨尾矿性质、浆体颗粒悬浮机理、非均质悬液淤积流速、磨阻损失、磨损机理研究分析,设定该钨矿尾矿浆体以紊流流态输送,速度区间为2~2.5 m/s,最大输送压力为40 kg/cm^2。在管道磨蚀控制、输送泵配置、检测仪器配置等方面,工程设计中注入了诸多相应技术措施。实际运转证明,输送系统运行安全、稳定,达到了设计预期目标。 Based on the analysis of properties of tungsten tailings, mechanism of particle suspension in slurry, sediment velocity of heterogeneous suspension, friction loss and wear mechanism, an experiment was conducted for a kind of tungsten tailings slurry transported in a state of turbulence at the velocity of 2~2.5 m/ s, with the maximum transporting pressure at 40 kg/ cm^2. For the engineering design, some corresponding technical measures were taken in terms of pipe wear control, arrangement of transportation pumps and detectors. The practice verified that such transportation system was safe and stable, up to the designing expectation.
作者 刘军 LIU Jun(Xiaoliugou Tungsten Mine of Gansu Xinzhou Mining Industry Co Ltd, Jiuquan Iron and Steel ( Group) Co Ltd,Jiayuguan 735100, Gansu, China)
出处 《矿冶工程》 CAS CSCD 北大核心 2019年第1期32-35,共4页 Mining and Metallurgical Engineering
关键词 管道输送 钨矿 尾矿 紊流 淤积流速 磨阻损失 磨损 pipeline transportation tungsten ore tailings turbulence deposit velocity friction loss wear loss
  • 相关文献

参考文献4

二级参考文献29

  • 1谭明皓,柴天佑.基于案例推理的层流冷却过程建模[J].控制理论与应用,2005,22(2):248-253. 被引量:24
  • 2张士林,许振良,邵龙潭.浮游界限速度的求解方法研究[J].哈尔滨工业大学学报,2006,38(2):279-281. 被引量:6
  • 3严爱军,柴天佑,岳恒.竖炉焙烧过程的多变量智能优化控制[J].自动化学报,2006,32(4):636-640. 被引量:20
  • 4Cutler C R, Perry R T. Real time optimization with multi variable control is required to maximize profits. Computers and Chemical Engineering, 1983, 7(5): 663-667
  • 5Young R E. Petroleum refining process control and real-time optimization. IEEE Control Systems Magazine, 2006, 26(6): 73-83
  • 6Garduno-Ramirez R, Lee K Y. Supervisory multiobjective optimization of a class of unit processes: power unit case study. In: Proceedings of the American Control Conference. Arlington, USA: IEEE, 2001. 1497-1502
  • 7Engell S. Feedback control for optimal process operation. Journal of Process Control, 2007, 17(3): 203-219
  • 8Skogestad S. Plantwide control: the search for the self- optimizing control structure. Journal of Process Control, 2000, 10(5): 487-507
  • 9Findeisen W, Bailey F N, Brdys M, Malinowski K, Wozniak P, Wozniak A. Control and Coordination in Hierarchical Systems. New York: John Wiley, 1980
  • 10Nath R, Alzein Z. On-line dynamic optimization of olefins plants. Computers and Chemical Engineering, 2000, 24(2): 533-538

共引文献123

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部