摘要
地铁隧道是我国城市发展进程中不可缺少的一部分,地铁车站的建设是其中重要的一个环节。如何在建设期对地铁车站建设前期和中期对施工过程进行安全隐患的排查控制以及对建设期间各类突发事件的处理,是保证地铁建设项目顺利进行的关键。本文利用杭州某基坑开挖围护渗漏事故,并根据实际工程监测数据分析,为保障地铁基坑的建设,提出合理化建议及措施。
As an indispensable part of urban development in China,the construction of subway station is an important part.The key to guarantee the smooth progress of subway construction project is how to check and control the hidden danger of safety in the construction process in the early and middle period of the construction period and how to deal with various emergencies during the construction period.This paper makes use of the leakage accident of a foundation pit excavation in hangzhou,and based on the analysis of the monitoring data of the actual project,puts forward reasonable Suggestions and measures to guarantee the construction of the subway foundation pit.
作者
杨诺
YANG Nuo(Ningbo Alatu Digital Science and Technology Center,Ningbo Zhejiang 315000,China)
出处
《北京测绘》
2019年第3期354-357,共4页
Beijing Surveying and Mapping
关键词
车站基坑
围护渗漏
监测分析
foundation pit
containment leakage
monitoring analysis