摘要
水电工程投资大、工期长,合理选择施工承包合同计价方式无论对于发包人控制工程投资,还是对于承包人降低成本,控制风险,都具有十分重要的意义。实践中,水电工程施工合同一般采用以固定单价承包为主,固定总价承包为辅的计价方式。以向家坝水电站工程施工合同为例,重点讨论了固定总价承包计价方式在水电工程施工过程中出现的问题和解决方法。
Hydropower projects are usually of large investment and long construction period.Thus,it is of great significance to choose a reasonable pricing method of the construction contract for the contract issuing party to control the total investment and also for the contractors to control the cost and risks.In practice,the fixed unit price contract is mainly adopted in the construction contract of hydropower projects,while the fixed total price contract may adopted as the supplement.Based on the experience of Xinjiaba Hydropower Station,the application issues and solutions of the fixed total price contract in hydropower projects are discussed.
作者
刁目广
DIAO Muguang(China Three Gorges Construction Management Co.,Ltd.,Yibin 644600,China)
出处
《水电与新能源》
2019年第3期20-22,共3页
Hydropower and New Energy
关键词
水电工程
施工合同
计价
固定总价承包
hydropower project
construction contract
pricing method
fixed total price contract