期刊文献+

预应力混凝土连续梁桥顶推施工中落梁方案比选 被引量:1

Selection of scheme of jacking-down of girder in incremental launching construction of prestressed concrete continuous girder bridge
下载PDF
导出
摘要 以振东路三跨预应力混凝土连续箱梁桥为研究对象,通过在支承节点处施加竖向强迫位移的方式来模拟主梁的落梁,分析了单墩、双墩和三墩起顶时该桥的结构受力状态,计算了各起顶方案的千斤顶顶升力和主梁的应力。综合考虑施工条件,最终选择单墩起顶的落梁方案,同时将理论值与实测结果进行比较。结果表明:落梁过程中采用单墩、双墩和三墩起顶的落梁方案各墩的千斤顶顶升力相差不大、梁体应力满足要求。采用单墩起顶时箱梁顶、底板始终处于受压状态,顶升力和箱梁应力的有限元的计算结果与实测结果吻合较好。 Taking the three-span prestressed concrete continuous box girder bridge of Zhendong Road as the research object,the process of jacking-down of the concrete box girder of the bridge was simulated and analyzed by method of applying forced vertical displacement at the support nodal point,analyzed the structural stress state of the bridge,the jacking forces of the jacks and the stress of the girder were calculated when the single pier,double pier and three pier are raised.Considering the construction conditions comprehensively,the project of single pier is finally selected,and the theoretical value is compared with the measured result.The results show that the stress of the girder of the project with single pier,two piers and three piers is satisfied.The top and bottom slabs of the box girder with songle pier are always under compression,the simulation calculations of jacking forces and the stress of the girder are agree well with the measurements.
作者 耿娇娇 GENG Jiao-jiao(School of civil engineering,Changsha University of Science and Technology,Changsha,Hunan 410114,China)
出处 《黑龙江交通科技》 2019年第3期75-76,79,共3页 Communications Science and Technology Heilongjiang
关键词 顶推施工 落梁 方案比选 有限元计算 incremental launching construction jacking-down of girder scheme comparison finite element calculation
  • 相关文献

参考文献3

二级参考文献31

  • 1王浩,李爱群,赵大亮,郭彤.润扬悬索桥钢箱梁受力分析及实验研究[J].哈尔滨工业大学学报,2006,38(7):1062-1064. 被引量:10
  • 2向建军,王甜,戴小冬.顶推法架设佛山平胜桥钢加劲梁关键技术[J].中外公路,2006,26(6):55-58. 被引量:4
  • 3王卫锋,林俊锋,马文田.桥梁顶推施工导梁的优化分析[J].工程力学,2007,24(2):132-138. 被引量:53
  • 4周叶飞.变曲率竖曲线钢箱梁顶推受力特性及施工控 制技术研究[D].长沙:长沙理工大学,2010.
  • 5Zhang Ye-zhi, Luo Ru-deng. Patch loading and improved measures of incremental launching of steel box girder[J]. Journal of Constructional Steel Research, 2012,68(1):11-19.
  • 6Rosingoli M. Bridge luanching[M]. London: Thomas Telford Publishing, 2002.
  • 7Karoumi R. Some modeling aspects in the nonlinear finite element analysis of cable supported bridges[J], Computers and Structures,1999,71 (4) : 397-412.
  • 8Zhang H,Des R R. Experimental and analytical studies on a streamlined steel box girder [J], Journal of Constructional Steel Research,2010,66(7) :906-914.
  • 9Jung K Ht Kim K S, Sim C W, et al. Verification of incremental launching construction safety for the Iis-un bridge?the world’s longest and widest prestressed concrete box girder with corrugated steel web section [J]. Journal of Bridge Engineering, 2011,16(3); 453-460.
  • 10Farahani K?Mofid M, Vafai A. A solution method forgeneral contact-impact problemsQ]. Computer Methods in Applied Mechanics and Engineering, 2000,187 (1-2):69-77.

共引文献40