期刊文献+

官地煤矿厚煤层综放面深孔爆破处理顶板技术及应用 被引量:7

Deep Hole Blasting Roof Treatment and Its Application of Fully Mechanized Face with Extra Thick Coal Seam of Guandi Coal Mine
下载PDF
导出
摘要 针对厚煤层综放开采顶板平衡结构向高位转移、重力不能够及时向下传递的问题,为了使厚层顶煤能够在矿压作用下及早碎裂、提高冒放性,官地煤矿29406综放工作面采取人工预裂顶板的技术。首先,通过理论计算预评价顶板初次断裂步距;随后采取数值模拟的方法分析了爆破后顶煤碎裂效果,并运用矿压监测数据分析了顶板预裂对支架压力值的改善作用,为保证安全生产提供了参考。 To the difficulty problems of roof balance structure transfer to high level of fully mechanized top coal mining with extra thick coal seam,and then weight could not transfer to low level in time,in order to improving caving property and ensured roof fractured timely under pressure of top coal seam,artificial pre-splitting roof technology was applied in 29406 fully mechanized top coal mining face of Guandi coal mine,first,the first fracture distance of roof was evaluated by theoretical calculation,and then top coal fracturing results was analyzed by number simulation,the improving results of roof pre-splitting to supports pressures were also analyzed by pressure monitoring data,and referenced for safety production.
作者 高梓 李春睿 GAO Zi;LI Chun-rui(Guandi Coal Mine,Xishan Coal and Power Group,Taiyuan 030000,China;Coal Mining & Designing Department,Tiandi Science & Technology Co.,Ltd.,Beijing 100013,China)
出处 《煤矿开采》 北大核心 2019年第1期116-119,共4页 Coal Mining Technology
基金 国家重点研发计划项目(2016YFC0600708) 国家自然科学基金面上项目(51474128)
关键词 深孔爆破 强制放顶 初次来压 deep hole blasting roof forced caving first weighting
  • 相关文献

参考文献9

二级参考文献27

共引文献125

同被引文献57

引证文献7

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部