后注浆灌注桩在孟加拉某电厂工程中的应用 被引量:1

Application of Post-grouting Pile in the Power Plant Engineering Bangladesh
下载PDF
导出
摘要 结合孟加拉某电厂工程后注浆灌注桩与普通灌注桩静载荷试验,介绍了灌注桩后注浆技术处理深厚充填沉积软土地层的施工工艺和控制参数,分别采用中标、美标和孟加拉标准对试验结果进行对比分析,确定后注浆灌注桩桩基允许承载力,采用后注浆灌注桩后承接力提高68.6%。 Combined with static load test of post-grouting pile and common pile,introduces construction technology and control parameters of the post-grouting pile consolidating thick sedimentary soft soil in Bangladesh power plant.By comparing the differences of bearing capacity test method and allowable value criteria among China,US and Bangladesh standards,the allowable bearing capacity of post-grouting pile is confirmed.After adopting post-grouting technology the bearing capacity increases by 68.6%.
作者 周占磊 赵春晓 ZHOU Zhan-lei;ZHAO Chun-xiao(Power China Hebei Electric Power Design & Research Institute Co.,Ltd.,Shijiazhuang 050031,China)
出处 《电力勘测设计》 2019年第2期6-9,共4页 Electric Power Survey & Design
关键词 后注浆 钻孔灌注桩 允许承载力 post-grouting bored piles allowable bearing capacity
  • 相关文献

参考文献3

二级参考文献7

  • 1刘金砺,祝经成.泥浆护壁灌注桩后注浆技术及其应用[J].建筑科学,1996,12(2):13-18. 被引量:81
  • 2龚维明,邹小平.钻孔灌注桩桩底压浆设计施工分析[J].建筑结构,1996,26(4):47-50. 被引量:18
  • 3建筑地基基础设计规范(GBJ7—89).中国建筑工业出版社.1990.
  • 4北京地区建筑地基基础勘察设计规范(DBJ 01—501--92).1993.
  • 5建筑桩基技术规范(JGJ 94—94).1995.
  • 6李如白.弹性地基梁板计算程序(BASES).北京科技中心软件部.1992.
  • 7朱炳寅.北京名人广场结构设计及分析研究.第十四届全国高层建筑结构学术交流会论文集,中国建筑科学研究院,1996, 8.

共引文献42

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部