500kV变电站电气施工中GIS设备安装调试技术的应用 被引量:14

Application of GIS Equipment Installation and Debugging Technology in Electrical Construction of 500kV Substation
下载PDF
导出
摘要 本文将首先介绍GIS设备的特点,其次,分析500kV变电站电气施工中GIS设备安装调试注意事项,最后,研究500kV变电站电气施工GIS设备安装调试技术的应用,提升变电站施工质量。 This paper will first introduce the characteristics of GIS equipment. Secondly, it will analyze the matters needing attention in installation and commissioning of GIS equipment in 500 kV substation electrical construction. Finally, it will study the application of installation and Commissioning Technology of GIS equipment in 500 kV substation electrical construction in order to improve the quality of substation construction.
作者 梁伟清 Liang Weiqing(GUANGXI POWER NETWORK CO., LTD. POWER NETWORK CONSTRUCTION BRANCH,Nanning Guangxi,530023)
出处 《电子测试》 2019年第6期114-115,共2页 Electronic Test
关键词 500KV变电站 GIS设备 安装调试技术 500kV substation GIS equipment installation and debugging technology
  • 相关文献

参考文献3

二级参考文献6

共引文献17

同被引文献79

引证文献14

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部