高压旋喷桩在石渣层施工中漏浆问题的解决 被引量:2

Solution of slurry leakage problem of high-pressure jet grouting pile in construction of stone slag layer
下载PDF
导出
摘要 针对高压旋喷桩在石渣层中施工时发生漏浆而导致喷浆过程中不返浆的问题,比较采取填砂、降压、调浓水泥浆液以及充填灌浆等措施的效果。结果表明:高压旋喷施工过程中若出现不返浆的情况,采用充填灌浆进行堵漏效果显著,在漏浆不严重的情况下,通过简单的调控措施(填砂、调整施工参数等)亦可保证高压旋喷施工的正常进行。 To solve the slurry leakage problem of high-pressure jet grouting pile in construction of stone slag layer,the paper compares measures such as sand-filling,pressure-reducing,cement slurry and filling grouting and get to know that the filling grouting measure achieves obvious effect,and when the slurry leakage is not serious,with simple control measures(sand filling,adjustment of construction parameters,etc.),the normal operation of high-pressure jet grouting construction can be guaranteed.
作者 黄正 HUANG Zheng(China Communications 2nd Navigational Bureau 3rd Engineering Co.,Ltd.,Zhenjiang 212000,China)
出处 《水运工程》 北大核心 2019年第3期133-135,共3页 Port & Waterway Engineering
关键词 高压旋喷桩 石渣层 漏浆 充填灌浆 high-pressure jet grouting pile stone slag layer grout leakage filling grouting
  • 相关文献

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部