3Becker C, Scholl A. A survey on problems and methods in generalized assembly line balancing[J]. European Journal of Operational Research, 2006, 168(3):694-715.
4Scholl A, Becker C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J]. European Journal of Operational Research, 2006, 168(3):666-693.
5Boysen N, Fliedner M, Scholl A. A classification of assembly line balancing problems[J]. European Journal of Operational Research, 2007, 183(2):674-693.
6Thomopoulos N T. Mixed model line balancing with smoothed station assignments[J]. Management Science, 1970, 16(9):593-603.
7Chica M, Cordón ó, Damas S, et al. A robustness information and visualization model for time and space assembly line balancing under uncertain demand[J]. International Journal of Production Economics, 2013, 145(2):761-772.
8Boysen N, Fliedner M, Scholl A. Production planning of mixed-model assembly lines:Overview and extensions[J]. Production Planning and Control, 2009, 20(5):455-471.
9Altemeier S, Helmdach M, Koberstein A, et al. Reconfiguration of assembly lines under the influence of high product variety in the automotive industry——A decision support system[J]. International Journal of Production Research, 2010, 48(21):6235-6256.
10Yang C, Gao J, Sun L. A multi-objective genetic algorithm for mixed-model assembly line rebalancing[J]. Computers and Industrial Engineering, 2013, 65(1):109-116.