摘要
跨铁路桥梁施工中,因场地条件的限制,其施工方法通常采用人工的方式。结合实际的施工工程,对施工技术的前期准备到具体的现场施工进行了分析和介绍。
In the construction of bridges across railways,due to the limitation of site conditions,the construction methods usually adopt manual methods.In this paper,combined with actual construction projects,the preparation of construction technology to specific site construction is analyzed and introduced.
出处
《建筑技术开发》
2019年第3期131-132,共2页
Building Technology Development
关键词
跨铁路桥梁
技术装备
钢结构
cross-rail bridge
technical equipment
steel structure