摘要
通过对公路工程政府付费型PPP模式实施要点的详细分解,综合分析采购方式、监管方式、绩效考核、政府付费、成本及回报等要素,实现政府与社会资本之间合理分配项目风险,提高工程建设与运营的质量和效率,实现资源的优化配置,从而达到全寿命周期成本的最小化和项目利润的最大化。
Through the detailed analysis of the implementation points of the government-paid PPP model for highway projects,the factors such as procurement methods,regulatory methods,performance evaluation,government payment,cost,and return are comprehensively analyzed,so as to achieve a reasonable distribution of project risks between the government and social capital and improve the quality and efficiency of the construction and operation of the project so that achieve the optimal allocation of resources,so as to minimize the life cycle cost and maximize the profits of the project.
作者
梁永贵
申铁军
LIANG Yong - gui;SHEN Tie -un(Shanxi Road & Bridge Construction Group Co., Ltd.,Shanxi Taiyuan 030006 China)
关键词
PPP
政府付费:实施要点
Public Private Partnership
government payment
implementation points