期刊文献+

起重机装配线平衡问题优化研究 被引量:1

Research on Balance Problem of Crane Assembly Line
下载PDF
导出
摘要 为提高起重机的装配效率,缩短生产周期,决定采用流水线装配,将装配线平衡问题作为规划高效装配线的重要问题之一。依据装配工艺建立装配作业优先顺序图,采用线性规划法进行建模,运用Lingo软件求解最小工作站数,重新分配各工序。同时考虑装配任务作业时间的随机波动,利用物流仿真软件建立了起重机的装配线仿真模型,仿真数据显示模型结果可以满足年产能要求,有效解决了起重机的装配流水线平衡问题。 In order to improve the efficiency of the crane assembly and shorten the production cycle,we opt to use the assembly line practice,and take the balancing of the assembly line as one of the key points in the planning of an efficient assembly line.According to the working process of the assembly line,we establish the priority order of the assembly activities,and build a model by using the linear programming method.Then we use Lingo to obtain the minimum number of workstations and rearrange the working sequence of the line.Meanwhile,considering the random fluctuation of the time required to finish the assembly tasks,we use a logistics simulation software to build the simulation model of a crane assembly line.The data yielded from the simulation shows that the model could help the assembly line meet the requirements of annual capacity which can effectively solve the balancing problem of crane assembly line.
作者 杨楠楠 张思奇 马铭苑 邢樱雯 朱迎侨 葛琦 Yang Nannan;Zhang Siqi;Ma Mingyuan;Xing Yingwen;Zhu Yingqiao;Ge Qi(School of Transportation Engineering,Shenyang Jianzhu University,Shen Yang 110168,China)
出处 《物流技术》 2019年第3期102-107,共6页 Logistics Technology
基金 中国物流学会项目"基于虚拟仿真的起重机生产系统规划研究"(2018CSLKT3-199) 住建部项目"城市物流园区选址与布局规划研究"(2017-R2-039) 国家级大学生创新创业训练计划项目"基于精益生产的起重机生产系统规划设计"(201710153170)
关键词 起重机 装配线平衡 线性规划法 物流仿真 crane balance of assembly line linear programming method logistics simulation
  • 相关文献

参考文献7

二级参考文献57

共引文献82

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部