摘要
以江铜集团贵溪冶炼厂智能工厂建设一期工程为研究对象,对项目建设的全流程经历进行梳理和总结提炼,涵盖项目可行性研究、立项招标、需求分析、系统设计、开发实施、联调试运行上线主要里程碑阶段的实施经验总结,针对智能工厂建设过程中的自动化、智能化和信息化系统层级的建设实施,体会到智能工厂的建设内容的广泛和深入,提出智能工厂建设实践的重点关注内容,供参考和借鉴。
Taking the first phase project of intelligent plant construction of Guixi Smelter of Jiangxi Copper Corporation Limited as the research object, the whole process of the project construction is sorted out and summarized. It covers feasibility study, project bidding, demand analysis, system design, development and implementation, and summary of implementation experience in the main milestone stage of on-line debugging and operation. It aims at automation and intelligence in the process of intelligent plant construction. The construction and implementation of energy-based and information-based system level have realized the extensive and in-depth content of the construction of intelligent factory, and put forward the key contents of the construction practice of intelligent factory for reference.
作者
汪飞虎
WANG Fei-hu(Guixi Smelter,Jiangxi Copper Corporation Limited,Guixi 335424,Jiangxi,China)
出处
《铜业工程》
CAS
2019年第1期1-4,共4页
Copper Engineering
关键词
智能工厂
生产管控一体化
智能优化
关键用户
自动化
intelligent factory
integration of production management and control
intelligent optimization
key user
automation