10ZHANG J X, ZHANG D S, ZHANG L. Driving pre-driven roadway for coalface passing rapidly through fault and disposing of associated waste in underground[C]. Proceedings of the 13th International Symposium on Mine Planning and Equipment Selection. [S. l.]: A.A. Balkema, 2004:341-345.