在石油天然气场站建设中,管道焊接的质量控制和工艺是其中最为重要的一项内容,是一项比较复杂的工作,需要我们在对场站进行管道焊接前做好相应的准备工作,找到影响因素,了解其中的控制要点。通过我们对场站实际焊接管道进行分析和研究,保证管道焊接质量。
In the construction of oil and gas stations, the quality control and process of pipeline welding is one of the most important contents. It is a relatively complicated task. We need to prepare for the pipeline welding before the station. find the influencing factors and understand the key points of control. Through our analysis and research on the actual welding pipeline of the station, the quality of the pipeline welding is guaranteed.
作者
孙中兵
SUN Zhong-bing(Daqing Oilfield Construction Group Installation Co.,Ltd. Daqing 163000,China)
出处
《全面腐蚀控制》
2019年第1期68-69,72,共3页
Total Corrosion Control
关键词
管道焊接
缺陷
防范
pipe welding
defect
prevention