摘要
通风系统的优化设计对于矿井安全生产至关重要,本文针对夏店煤矿矿井通风阻力大和供风量小等通风系统改造难题,结合夏店煤矿生产衔接计划及长远规划,对北翼采区、三一采区、三二采区合理衔接与通风系统优化调整方案进行了预测分析,对可能进行的北翼采区通风系统优化改造方案进行了比较,利用夏店煤矿矿井通风管理信息系统提出了最终的北翼采区通风系统改造实施方案。
The optimization design of ventilation system is very important for the safety of mine production.In this paper,the problems of ventilation system transformation in Xia store coal mine with large ventilation resistance and small air supply are difficult.Combining with the production connection plan and long-term plan of Xia Dian coal mine,the rational adjustment and adjustment of the northern wing,31 and 32 areas are optimized and the ventilation system is optimized.The case is predicted and analyzed,and the ventilation system optimization scheme for the North Wing mining area is compared,and the final ventilation system transformation scheme is proposed by using the mine ventilation management information system in the Xia store coal mine.
作者
王永红
WANG Yonghong(Xiadian coal mine of Cilinshan mine Limited Company in Lu'an mine Group,Changzhi Xiangyuan 046203)
出处
《煤矿现代化》
2019年第3期12-14,共3页
Coal Mine Modernization
关键词
夏店煤矿
通风系统优化
通风仿真
方案比较
实施方案
Xiadian coal mine
Ventilation system optimization
Ventilation simulation
Scheme comparison
Implementation plan