选择合理施工工艺参数采用沉降差法控制石方路基压实质量 被引量:3

Choose Reasonable Construction Process Parameters Controlling the Compaction Quality of Shifang Subgrade by Settlement Difference Method
下载PDF
导出
摘要 目前国内填石路基检测压实质量常采用干密度、沉降差、面波等单一方法进行质量检测,这些方法均存在一些不足。我们知道路堤压实质量与压路机的压实功率、碾压速度、压实遍数、铺筑厚度、填料粒径、填料强度等施工工艺参数有关。如果采用沉降差法检测压实质量并同时对施工工艺参数进行控制,能够有效地保证填石路堤的压实质量。 at present,the quality of the compaction quality of the domestic filling stone roadbed is often used to detect the quality of the single method,such as dry density,differential settlement and surface wave,etc.,which have some shortcomings.We know that the compaction quality of the embankment is related to the compaction power of the roller,the compaction speed,the compaction,the thickness of the pavement,the filling particle size and the filling strength.If the compaction quality is detected by the settlement difference method and the construction process parameters are controlled simultaneously,the compaction quality of the filling stone embankment can be ensured effectively.
作者 贾纯斌 JIA Chun-bin(Daqing Oilfield Limited Company Infrastructure Management Center,Daqing 163000,China)
出处 《全面腐蚀控制》 2019年第3期61-64,共4页 Total Corrosion Control
关键词 沉降差法 土石路基 settlement difference method earth rock subgrade
  • 相关文献

参考文献1

二级参考文献3

共引文献2

同被引文献9

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部