摘要 北京市永定河保障房段左堤约4.1 km河段以老堤和套堤双堤形式防洪,目前,金隅滨河园(即保障房)等居民设施建设在两堤之间,入住人口约3万人,地势低洼,永定河洪水及防洪工程建设直接关系到两堤间居民的生命财产安全。通过永定河三家店—卢沟桥约15.5 km河段物理模型试验,明确了保障房段各级洪水条件下行洪水位和两堤间居民的淹没风险;观测水流流速、流势、河床变形及堤脚冲淤情况,分析了洪水对套堤安全稳定性的影响;提出按定床试验水位加高套堤、加固套堤基础(防护深度不小于10 m)的建议。 The old embankment and set-back levee are located at the left bank,4.1 km,of Yongding river,which are used to defense flood.Because of the low terrain,Yongding river’s flood control project is directly related to the safety of the 30,000 residents in the region.Based on the physical model test of the 15.5 kilometers section from Sanjiadian to Lugou bridge of Yongding river,flood level and flooding risk of the indemnificatory apartment region are studied.The flow velocity,flow potential,riverbed deformation and scouring or silting conditions of the levee are observed,and the impact of flood on the safety and stability of the set-back levee is also analyzed.The levee construction plan of the river section is discussed,and heightening and strengthening the set-back levee is proposed(the reinforcement depth of the levee toe is no less than 10 meters).
作者 程帅 张春义 王理许 王远航 周星 张猛 CHENG Shuai;ZHANG Chunyi;WANG Lixu;WANG Yuanhang;ZHOU Xing;ZHANG Meng(Beijing Water Science and Technology Institute, Beijing 100048, China;Hohai University, Nanjing 210098, China;Beijing Management Division of North Grand Canal, Beijing 101100, China)
出处 《北京水务》 2019年第1期15-20,共6页 Beijing Water
关键词 物理模型 永定河 保障房段 防洪安全 physical model Yongding river indemnificatory housing flood control safety
  • 相关文献

参考文献5

二级参考文献68

共引文献55

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部