摘要
以实际预应力混凝土连续梁桥为依托,对预应力混凝土连续梁桥的施工控制进行研究分析。从施工监控的目的出发,分析了线性监控的实施过程,重点介绍了测点的布置,最后通过对成桥合龙段的测点所测实际值与理论值的对比得出线性监控的结果。
Based on the actual prestressed concrete continuous girder bridge,this paper studies and analyzes the construction control of prestressed concrete continuous girder bridge.Based on the purpose of construction monitoring,the implementation process of linear monitoring is analyzed,and the arrangement of measuring points is introduced.Finally,the results of linear monitoring are obtained by comparing the measured actual values with the theoretical values of the measuring points of the closure section.
作者
陈震
高川川
Chen Zhen;Gao Chuan-chuan
出处
《建筑技术开发》
2019年第1期117-118,共2页
Building Technology Development
关键词
预应力混凝土
连续梁桥
线性监控
prestressed concrete
continuous beam bridge
linear monitoring