摘要 福清核电厂建立了大修期间免扰设备管理机制,以明确电厂对免扰设备的定义、期望和管理举措。根据福清核电厂大修实践,介绍了福清核电厂在计划安排、状态转换、工作开展等,采取实体屏障、风险提示、工作控制以及状态评估等多重手段,确保免扰设备的可用性。 Fuqing nuclear power plant was established during the overhaul,interference free equipment management mechanism,in order to clear the definition of power plant,interference free equipment and expectations of management initiatives.According to the overhaul practice of Fuqing Nuclear Power Plant,it was introduced that Fuqing nuclear power plant adopted multiple means,such as physical barrier,risk prompt,work control and condition assessment,to ensure the availability of disturbance-free equipment.
作者 王伟 WANG Wei(Fujian Fuqing Nuclear Power Co.,Ltd.,Fuzhou Fujian 350318)
出处 《河南科技》 2019年第1期33-34,共2页 Henan Science and Technology
关键词 免扰设备 大修安全 停堆安全 核安全 实体屏障 protected equipment safety of outage shutdown safety safety of nuclear reactors physical barrier
  • 相关文献

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部