摘要
某水厂目前主要有两条生产线(2×10~4m^3/d),一条为"混凝+沉淀+过滤"工艺;另一条主体构筑物为澄清池,缺少"过滤"环节。水厂位于城区,用地狭小,提标改造工程(3×10~4m^3/d)充分利用现有构筑物及设施,新建2×10~4m^3/d的絮凝斜管沉淀池、3×10~4m^3/d的滤池及2 970. 24 m^3的清水池。工程实现了不断水施工,并集约化布置净水处理的核心设施,全面梳理和统一布置厂区内地下管道。目前改造工程已稳定运行一年多,所有出水水质指标均符合《生活饮用水卫生标准》(GB 5749—2006)以及《城市供水水质标准》(CJ/T 206—2005)。
There were two main production lines in a waterworks( 2 × 10~4m^3/d),one was"coagulation + precipitation + filtration"process,the other main structure was a clarification pool,which lacked the "filtering"stage. The water plant was located in the urban area and the land was small.Therefore, some existing structures and facilities were fully utilized in the upgrading project( 3 × 10~4m^3/d),a new 2 × 10~4m^3/d flocculation oblique tube sedimentation tank,3 × 10~4m^3/d filter tank and 2 970. 24 m^3 clear tank were built. The project realized continuous water construction and intensive arrangement of core facilities for water purification,and arranged underground pipelines in the plant area in an all-round way. At present,it had been running safely for more than a year. All the effluent quality indexes were in line with the Standards for Drinking Water Quality( GB 5749-2006)and the Water Quality Standards for Urban Water Supply( CJ/T 206-2005).
作者
尤鑫
吴瑜红
雷培树
邹磊
万年红
翟汉民
YOU Xin;WU Yu-hong;LEI Pei-shu;ZOU Lei;WAN Nian-hong;ZHAI Han-min(Central and Southern China Municipal Engineering Design & Research Institute Co. Ltd., Wuhan 430010, China;Wuxue City Waterworks Co. Ltd., Wuxue 435400, China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2019年第4期71-74,共4页
China Water & Wastewater
关键词
老旧水厂
改扩建
设计
old waterworks
renovation and expansion
design