摘要
软土地层基坑事故原因包括天气、施工、地质、监测及设计等因素,深基坑施工时应加强过程管理与控制,各参建方应加强沟通协调,及时分析施工过程中发生的异常情况,必要时采取有针对性的应急措施。
Factors causing accidents of foundation pit on soft-soil stratum include weather factor, construction factor, geologic factor, monitoring factor and design factor, etc. Therefore, deep foundation pit construction shall emphasize process management control and all participant units shall pay attention to communication, carry out immediate analysis on any abnormal phenomenon during construction, and emergency measures shall be adopted if necessary.
作者
李佳
LI Jia(Sanmenxia Polytechnic, 472000, Sanmenxia, He'nan, China;School of Application Engineering, He'nan University of Science and Technology, 472000, Sanmenxia, He'nan, China)
出处
《建筑技术》
2019年第3期309-311,共3页
Architecture Technology
基金
河南省高等学校“专业综合改革试点”项目(豫教高〔2015〕33号)
河南省高等学校“特色专业建设”项目(豫教高〔2012〕979号)
关键词
深基坑
软土
基坑事故
deep excavation
soft-soil
engineering accident