摘要 要采用现代化综采工作面快速搬家技术,首先,相关人员要做好拆除与安装工作面的准备工作,然后与其中内容相结合,基于此,论文对现代化综采工作面快速搬家主要技术进行了分析,得出相关人员需有效协调外围有关单位、及时优化工作面拆除与安装工艺以及注重拆除与安装细节的质量这三方面内容。此外,论文还在此基础上对综采工作面快速搬家技术中的重点注意事项进行了简要分析,以实现现代化综采工作面快速搬家技术应用的高效化,希望能够为有关人士提供帮助。 To adopt the quick moving technology of modern fully mechanized mining face, firstly, relevant personnel should make good preparations for demolition and installation of working face, and then combine with its contents. Based on this, the paper analyzes the main technology of fast moving in modern fully mechanized mining face, and draws the conclusion that the relevant personnel should effectively coordinate the peripheral units, optimize the dismantling and installation technology of working face in time, and pay attention to the quality of the details of dismantling and installation. In addition, on this basis, the paper also makes a brief analysis of the key points to be paid attention to in the rapid moving technology of fully mechanized mining face, so as to realize the high efficiency of the application of the rapid moving technology of modern fully mechanized mining face, hoping to provide some help for the relevant personnel.
作者 马兴国 MA Xing-guo(Jizhong Energy Zhangjiakou Mining Group Co. Ltd., Zhangjiakou 075300, China)
出处 《中小企业管理与科技》 2019年第6期178-179,共2页 Management & Technology of SME
关键词 现代化 综采工作面 快速搬家 modernization fully mechanized mining face rapid moving
  • 相关文献

参考文献5

二级参考文献19

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部