琴键堰水力特性数值模拟 被引量:8

Numerical Study of Characteristics and Discharge Capacity of Piano Key Weir
下载PDF
导出
摘要 为了探究琴键堰水力特性,采用VOF模型模拟了琴键堰运行时的三维流场,采用Lempérière的试验结果验证了VOF模型数值模拟方法的可靠性。通过不同几何结构的琴键堰进行的正交数值试验,确定了影响琴键堰泄流效率的主要几何参数;并针对这些几何参数,进行了数值仿真计算和理论分析,推导了琴键堰的新流量计算公式,经验证,该公式最大相对误差为6.7%,平均相对误差为3.7%。研究成果可为琴键堰的设计和工程应用提供可靠理论依据。 The three-dimensional flow fields in a piano key weir were simulated using the volume-of-fluid (VOF) model, and the reliability of VOF model result was verified according to Lempérière's test result. An orthogonal numerical test revealed major geometric parameters that affect the discharge efficiency of piano key weir. Numerical simulations and theoretical analysis were conducted to analyse the effects of these geometric parameters. New formula for the discharge of piano key weir was then derived and verified. The maximum relative error of the proposed formula is 6.7%, and the mean relative error 3.7%. The proposed formula improves the accuracy of the design and structural optimization of piano key weir.
作者 胡晗 杨伟 侯冬梅 HU Han;YANG Wei;HOU Dong-mei(Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China)
出处 《长江科学院院报》 CSCD 北大核心 2019年第4期60-66,共7页 Journal of Changjiang River Scientific Research Institute
基金 国家自然科学基金项目(51709014) 国家重点研发计划项目(2016YFC0401904) 中央级公益性科研院所基本科研业务费专项(CKSF2017011/SL CKSF2017055/SL)
关键词 琴键堰 水力特性 数值模拟 VOF模型 正交数值试验 泄流效率 几何参数 泄流计算公式 piano key weir hydraulic characteristics numerical simulation VOF model orthogonal numerical experiment discharge efficiency geometric parameters discharge calculation formula
  • 相关文献

参考文献3

二级参考文献18

  • 1耿运生,孙双科.一种新型的迷宫堰布置形式-P.K堰[J].南水北调与水利科技,2006,4(4):57-59. 被引量:9
  • 2Lemp6ri6re, F., and Ouamane, A. The Piano Keys weir: a new cost-effective solution for spillways [J]. Hydropower & Dams, 2003, 7 (5): 144-149,.
  • 3F. Lemp6ri6re, Guo Jun. Low cost increase of dams storage and flood mitigation: the Piano keys weir [R], 2005.
  • 4Laugier, F. Design and construction of the first Piano Key Weir (PKW) spillway at the Goulours dam [J]. Hydropower & Dams, 2007,14 (5): 94-101.
  • 5Laugier E, J. Vermeulen &V.Lefebvre. Overview of Piano key Weirs experience developed at EDF during the past few year [C]. Proceedings of the seeend International Workshop on Labyrinth and Piano Key Weirs 2013, Chatou Paris, France, 2013.12.
  • 6Eichenberger P.. the first commercial piano key weir in Switzerland. Proceedings of the secend International Workshop on Labyrinth and Piano Key Weirs 2013, Chatou Paris, France, 2013.12.
  • 7Ackers J.C, F.C.J.Bennett T.A.Scott& G.Karunarame. Raising the beUmouth spillway at black Esk Reservoir using Piano Key Weirs. Proceedings of the secend International Workshop on Labyrinth and Piano Key Weirs 2013, Chatou Paris, France, 2013.12.
  • 8Experiment study on labyrinth/piano key spillway [R]. Final report on R&D project, Indian institute of technology, Roorkee, 2009.
  • 9Leite Ribeiro M, Pfister M, Schleiss A Jet al. Hydraulic design of A-type Piano Key Weirs [J]. Journal of Hydraulic Research,2012(a), 50(4): 400-408.
  • 10Erpicum S, Laugier, Michael Pet al. Labyrinth and Piano Key Weirs II [M]. CRC Press, 2013.

共引文献21

同被引文献41

引证文献8

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部