摘要 对某故障的110 kV整体预制干式电缆终端进行检测、解体分析,结合其运维状况判断其在安装完毕后未进行可靠固定,以致在外力作用下发生摆动、弯曲致应力锥移位,从而造成电缆绝缘屏蔽断口处局部场强过高而发生击穿,针对故障原因对整体预制干式电缆终端的质量控制提出了建议。 The faulty 110 kV integral prefabricated and dry-type power cable terminal was detected and disassembled.Combined with its operation and maintenance status,it was judged that the tested cable terminal was not reliably fixed after installation,and the stress cone was shifted due to swing and bending under the action of external forces,which resulted in the cable breakdown due to the high local electric field intensity at the insulation shield fracture.Aiming at the fault reasons,some suggestions were put forward on the quality control of the integral prefabricated dry cable terminal.
作者 伍弘 刘世涛 丁培 房子袆 杨凯 吴波 WU Hong;LIU Shitao;DING Pei;Fang Ziyi;Yang Kai;WU Bo(Power Research Institute of State Grid Ningxia Electric Power Co.,Ltd.,Yinchuan Ningxia 750011,China)
出处 《宁夏电力》 2019年第1期20-24,共5页 Ningxia Electric Power
关键词 整体预制式 干式 电缆终端 应力锥 电场强度 integral prefabricated dry-type power cable terminal stress cone electric field intensity
  • 相关文献

参考文献8

二级参考文献48

共引文献129

同被引文献18

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部