新近吹填淤泥真空预压一次性处理关键技术 被引量:2

Key technology of a one-time vacuum preloading improving for the fresh hydraulic reclaimation mud
下载PDF
导出
摘要 针对新近吹填淤泥采用二次处理技术加固工期虽短但施工成本较高的问题,提出了一种新的吹填淤泥地基真空预压一次性处理技术。从施工流程、技术参数、材料性能参数、施工要点等方面重点介绍了其中3项关键技术:新型大面积砂被工作垫层、新型真空预压排水系统以及分级真空预压技术。基于依托工程对该技术的加固效果和直接施工成本进行了概括性分析,结果表明该技术加固效果较佳、相对二次处理技术成本显著降低。 Aiming at the problem that the time limit of reinforcing fresh hydraulic reclaimed mud with secondary treatment technology is short but the construction cost is high,a new one-time treatment technology of vacuum preloading for dredged silt foundation is put forward.Three key technologies are introduced in detail from the aspects of construction process,technical parameters,material performance parameters and key points of construction:new type of large-area sand bedding,new type of vacuum preloading drainage system and graded vacuum preloading technology.Based on the general analysis of the reinforcement effect and the direct construction cost of the technique,the results show that the reinforcement effect of the technique is better and the relative cost of the secondary treatment technology is significantly reduced.
作者 谢荣星 杨茯苓 鲍树峰 张波云 阮涛 余东华 张建喜 郑广 XIE Rong-xin;YANG Fu-lin;BAO Shu-feng;ZHANG Bo-yun;RUAN Tao;YU Dong-hua;ZHANG Jian-xi;ZHENG Guang(Guangzhou Nansha Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou 510230,China;CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou 510290,China;The Fifth Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Fuzhou 350008,China)
出处 《水运工程》 北大核心 2019年第4期181-187,共7页 Port & Waterway Engineering
关键词 新近吹填淤泥 新型大面积砂被工作垫层 新型真空预压排水系统 分级真空预压技术 fresh hydraulic reclaimed mud new type of large area sand quilt cushion new type drainage system graded vacuum preloading technology
  • 相关文献

参考文献16

二级参考文献58

共引文献258

同被引文献22

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部