长洲水利枢纽泄水闸开度载荷监测技术改造探讨 被引量:2

Discussion on Technological Modification of Opening Degree Load Monitoring for Sluice Gate of Changzhou Hydro Project
下载PDF
导出
摘要 笔者针对长洲水利枢纽泄水闸开度载荷监测装置运行过程中存在控制开度偏差大、装置调校复杂等问题,提出了对泄水闸开度载荷监测进行技术改造的方案,并经试验运行证明效果良好,对于其他类似的泄水闸开度载荷监测技术改造有较好的借鉴意义。 In view of the problems of large deviation of control opening degree and complicated adjustment of device existing in the operation of the opening degree load monitoring device of the sluice gate of Changzhou Hydro Project,the author puts forward a scheme for the technological modification of the opening degree load monitoring of the sluice gate,which has been proved to be effective by the test operation,and has a good reference for technological modification of the opening degree load monitoring of other similar sluice gate.
作者 王丽华 WANG Lihua(SPIC Guangxi Changzhou Hydropower Development Co.,Ltd.,Wuzhou,Guangxi,543002)
出处 《红水河》 2019年第2期82-85,共4页 Hongshui River
关键词 泄水闸 开度 载荷 监测 技术改造 长洲水利枢纽 sluice gate opening degree load monitoring technological modification Changzhou Hydro Project
  • 相关文献

参考文献1

二级参考文献12

共引文献2

同被引文献26

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部