摘要
结合梅汕客专枫江特大桥承台施工采用钢板桩围堰技术,利用MIDAS/Civil建立有限元计算模型,对其钢板桩围堰工程不同施工阶段中钢板桩的最大应力、最大变形、支撑的最大应力等进行分析。在此基础上,结合规范公式计算分析了基坑稳定性及抗倾覆稳定性。结果表明,围堰结构的设计满足强度、刚度、稳定性要求。
Combined with the steel sheet pile cofferdam technology used in the foundation construction of Fengjiang Bridge of Meizhou-Chaoshan passenger special line project,the finite element calculation model is established by MIDAS/Civil,and the maximum stress and the maximum deformation of steel sheet pile and the maximum stress of the support in different construction stages of steel sheet pile cofferdam project are analyzed.On this basis,the stability and anti-overturning stability of foundation excavation are calculated and analyzed with the code formula.The results show that the design of cofferdam meets the requirements of strength,stiffness and stability.
作者
李克智
LI Kezhi(Tianjin Railway Construction Co.,Ltd.of China Railway Sixth Group Co.,Ltd.,Tianjin 300232,China)
出处
《施工技术》
CAS
2019年第5期47-51,70,共6页
Construction Technology
关键词
桥梁工程
混凝土连续刚构桥
钢板桩围堰
有限元分析
圈梁
抗倾覆
施工技术
bridges
concrete continuous rigid frame bridges
steel sheet pile cofferdam
finite element analysis
ring beams
anti-overturning
construction