摘要
扫浅施工是航道疏浚工程的收尾工作,对提高工程质量、保证工期进度、降低施工成本等各方面,都有着至关重要的影响和意义。文章以厦门港主航道扩建四期工程I标段为例,阐述了航道扫浅施工方法及重难点应对措施,以期为类似工程的扫浅施工提供一些参考。
Sweeping construction is the final work of waterway dredging project, which has a vital impact and significance on improving the quality of the project, ensuring the progress of the construction period, reducing the construction cost and so on. Taking the bid Section I of Xiamen Port Main Channel Extension Phase IV Project as an example, this paper expounds the construction method of channel sweeping and the countermeasures of heavy and difficult points, in order to provide reference for the shallow construction of similar projects.
出处
《科技创新与应用》
2019年第13期138-139,共2页
Technology Innovation and Application
关键词
航道疏浚
扫浅
施工方法
重难点
Channel dredging
sweeping shallow
construction method
heavy and difficult points