国际工程合同型联合体协议核心条款解读 被引量:5

Interpretation of the core clauses of international engineering contractual joint venture agreement
下载PDF
导出
摘要 国际工程市场竞争激烈,联合体承包已成为国际工程公司常见的合作模式。以国际工程合同型联合体协议为研究对象,基于若干国际工程公司联合体运营实践,从组织、决策条款框架视角分析了合同型联合体典型特征及问题,通过对比分析国际工程特性及合同型联合体协议条款,总结编制典型核心条款时可能会存在的问题,以联合体项目案例为辅,对典型核心条款细化分析并提出编写建议。 The competition in the international engineering market has become increasingly fierce, and joint venture contracting has become a common mode of cooperation among international engineering companies. Taking the international engineering contractual joint venture agreement as the research object, based on the current practice of several international engineering companies' joint venture operations, we analyzed the typical characteristics and problems of contractual joint venture from the perspective of organization and decision-making clause framework, and compared and analyzed international engineering characteristics and contracts, summarized the problems that may exist in the preparation of typical core clauses, and made detailed analysis of typical core clauses and put forward suggestions for the preparation of typical core clauses, supplemented by the case of the joint venture project.
作者 黄亚江 金鑫 丁玥 HUANG Ya-jiang;JIN Xin;DING Yue(Renai College, Tianjin University, Tianjin 301636, China;Tianjin Xiuda Law Firm, Tianjin 300384, China)
出处 《中国港湾建设》 2019年第4期73-77,共5页 China Harbour Engineering
基金 教育部产学合作协同育人项目(201801171001) 天津市高等学校提高创新能力引导项目和专项资金管理项目资助(201814038005) 天津市大学生创新创业训练计划项目(201814038005)
关键词 国际工程合同型联合体 协议条款 联合体僵局 案例对比分析 international engineering contractual joint venture agreement clause joint venture deadlock case comparison analysis
  • 相关文献

参考文献7

二级参考文献28

  • 1李卫平.国际石油项目代理协议性质和风险防范刍议[J].石油化工管理干部学院学报,2009,11(4):54-56. 被引量:1
  • 2郑宇,黄聪.英国的工程咨询外包市场[J].建筑经济,2005,26(1):92-94. 被引量:5
  • 3王守清,柯永建.国际工程联营体的风险管理[J].国际工程与劳务,2006(10):4-7. 被引量:3
  • 4Guomin Zhang, Patrick X. W. Zou,2007. "Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China". Joumal of Construction Engineering and Management 10, pp. 771-779.
  • 5Sung-Lin Hsueh, Yeng-Homg Pemg, Min-Ren Yan etc. 2007. "On-line multi-criterion risk assessment model for construction joint ventures in China". Automation in Construction 5, pp.607-619.
  • 6Andrew Gale, Jun Luo, 2004."Factors affecting construction joint ventures in China". International Journal of Project Management 22, pp.33 - 42.
  • 7L. Bing, Robert L. K. Tiong, 1999."Risk management model for international construction joint ventures". Journal of Construction Engineeri ng and Management 5, pp.377 - 384.
  • 8L.Y. Shen, W.C.G. Wu, S.K.C. Ng.,2001. "Risk assessment for construction joint ventures in China". Journal of Construction Engineering and Management 1.76- 81.
  • 9FIDIC. Conditions of Contract for Construction. 1 st Edition 1999.
  • 10YAO X,Higuichi T.Promises and Challenges of Evolvable Hardware [J].IEEE Trans On Systems Man and Cybernetics-Part C:Applications and Reviews,1999,29(1):87-97.

共引文献21

同被引文献48

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部