摘要
那棱格勒河水利枢纽是那棱格勒河干流唯一的一座大型综合性控制工程,具有防洪、供水、兼顾发电等综合利用功能。应用动态分析法对枢纽工程效益费用逐一进行了分析与计算,并对枢纽工程整体进行了国民经济评价和敏感性分析,得出那棱格勒河水利枢纽经济上合理、抗风险能力强和社会效益显著的结论。
The Nalenggele River Water Control Project is the only large-scale comprehensive control project in the main stream of the Nalenggele River. It has the functions of flood control, water supply, and comprehensive utilization of power generation. Dynamic analysis method is used to analyze and calculate the cost of the project benefit one by one, and the national economy evaluation and sensitivity analysis of the project as a whole, the conclusion that the water Conservancy Project of Nalenggele River is economically reasonable, has obtained. strong risk resistance and has significant social benefits.
作者
祁永吉
QI Yong-ji(Qinghai Provincial Water Resources Technical Assessment Center, Xining810001,China)
出处
《中国农村水利水电》
北大核心
2019年第4期120-123,131,共5页
China Rural Water and Hydropower
关键词
效益
经济评价
那棱格勒河水利枢纽
benefits
economic evaluation
Nalenggele River water project