国际工程物资管理标准化及物资运输进度管控的探讨 被引量:3

Discussion on International Engineering Material Management Standardization and Material Transportation Schedule Control
下载PDF
导出
摘要 国际工程的物资设备管理总是伴随计划制作、报审、合同签署、生产、出厂验收、集港、海运、清关、到货验收、入库、管理、出库、回收、核销等多个环节,其中,管理人员流动性大,人员素质参差不齐,导致物资管理工作效率低下,可接替性差,严重影响物资设备管理的各个环节;物资设备从生产到顺利抵达施工现场,制约物资设备到场进度的因素众多,任何一个制约因素都可影响物资设备到场进度。论文针对存在的问题进行探讨、分析,并结合多年项目物资管理经验,给出一些切实有效的解决方法。 International engineering material and equipment management is always accompanied by planning,review,contract signing,production,factory acceptance,port,shipping,customs clearance,arrival acceptance,warehousing,management,delivery,recovery,verification and other links.Among them,large turnover of management personnel and uneven quality of personnel result in low efficiency and poor replaceability of material management,which seriously affect all links of material and equipment management.From the production to the smooth arrival of materials and equipment to the construction site,there are many factors restricting the present progress of materials and equipment,and any one of them can affect the present progress of materials and equipment.This paper discusses and analyzes the existing problems,and combined with many years of project material management experience,gives some practical and effective solutions.
作者 陈华飞 CHEN Hua-fei(Sinohydro Engineering Bureau 4 Co.Ltd.,Xi'ning 810007,China)
出处 《工程建设与设计》 2019年第7期297-299,303,共4页 Construction & Design for Engineering
关键词 国际 工程 物资 标准化 运输 进度 管控 international engineering materials standardization transport schedule control
  • 相关文献

同被引文献8

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部