摘要
结合南水北调西黑山排冰闸的液压控制原理,对西黑山排冰闸控制原理和操作过程进行了介绍。浅析了液压启闭机双缸不同步的原因,重点阐述了液压系统的自动纠偏过程,以及解决闸控系统升级改造过程中遇到的系统与开度仪数据不一致的问题,并针对液压系统运行的稳定性提出了合理化建议。
In combination with the hydraulic control principle of the Xiheishan ice sluice of the South-to-North Water Diversion Project, this paper introduces the control principle and operation process of the Xiheishan ice sluice, analyzes the cause of synchronization failure of double cylinders of the hydraulic hoist, expounds the automatic deviation correction process of the hydraulic system and the solution to inconsistent data between the system and the opening meter during gate control system upgrading, and puts forward reasonable suggestions for the operation stability of the hydraulic system.
作者
吕睦
张希鹏
张超伟
曹瑞森
LV Mu;ZHANG Xi-peng;ZHANG Chao-wei;CAO Rui-sen(Tianjin Branch o f Construction and Administration Bureau of South-to-North Water Diversion Middle Route Project, Tianjin 300393, China)
出处
《水电站机电技术》
2019年第4期22-24,76,共4页
Mechanical & Electrical Technique of Hydropower Station
关键词
南水北调工程
排冰闸
液压启闭机
闸控系统
South-to-North Water Diversion Project
Ice sluice
Hydraulic hoist
Gate control system