期刊文献+

规则与方法:PPP项目风险及其三阶规制论 被引量:3

Rules and Methods:PPP Project Risk and Its Three-level Regulatory Theory
原文传递
导出
摘要 PPP模式在项目运行的不同阶段存在不同的风险,影响项目正常运行。PPP项目风险可以划分为决策阶段之风险、执行阶段之风险、评估救济阶段之风险、跨PPP项目生命周期各环节之风险。我国已经基本建立了多层次的监管体制,但仍存在法律规范不健全、多头监管、政策监管权缺乏约束等问题。对PPP项目风险进行规制,其核心就是构建PPP项目风险三阶规制体系,建立事前预防、事中治理、事后救济的基本框架,根据项目实施不同阶段采取风险预防措施、风险控制措施和权利救济措施。 In recent years,the "Public Private Partnership"(PPP) has been surging in China,and it has effectively promoted the development of public utilities in China.However, the PPP mode is not perfect.There are different risks in different stages of the PPP project,affecting the normal operation of the project.By examining the existing administrative supervision system of PPP risk in China,it is find that there are many problems,including imperfect legal norms,long supervision and lack of restrictions on government regulatory power.Therefore,on the basis of perfecting the legislation of PPP mode,we should apply various means of regulation,constructing the three-level regulatory system of project risk in advance prevention,in case management and after relief to ensure the smooth operation of PPP project.
作者 江国华 贺馨宇 JIANG Guo-hua;HE Xin-yu(School of Law,Wuhan University,Wuhan 430072 ,China)
机构地区 武汉大学法学院
出处 《江苏行政学院学报》 CSSCI 北大核心 2019年第2期128-136,共9页 The Journal of Jiangsu Administration Institute
关键词 PPP 项目风险 三阶说 风险监管 风险三阶规制体系 PPP project risk three-level theory risk regulation three-level regulatory system for risks
  • 相关文献

参考文献11

二级参考文献146

共引文献547

同被引文献32

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部