摘要 针对矿槽除尘管道生产过程中发生的垮塌事故,进行了详细的现场勘查和图纸复核。基于设计图纸和现场实施的调查情况,建立了设计和施工钢架支撑有限元模型,分析了钢架结构在持续加载过程中结构抗倒塌的力学性能,得出了疏于维保和不按图施工是事故发生的主要原因,同时为类似工程施工和运营提供了相应可行性建议。 Based on the accident of the dust precipitation pipeline collapses during production,crime scene investigation and recheck drawing has been carrying out detailed. Building the design and construction finite element model of the supporting steel frame based on the design drawing and condition of field construction, analyzing the performance on the structure of collapse resistance,when the steel frame in the process of loading, the main reason for accident happened resulted from maintenance carelessness and illegal operations, some suggestions are presented for the similar construct and maintenance of engineering.
作者 宋春芳 任盛 魏奇科 狄佳 SONG Chunfang;REN Sheng;WEI Qike;DI Jia(China metallurgical construction engineering group Co.,Ltd.,Chongqing 400080,China;Hunan urban construction design& research institute,Changsha 410000,China)
出处 《结构工程师》 北大核心 2019年第1期246-250,共5页 Structural Engineers
基金 重庆市社会事业与民生保障科技创新专项(cstc2017shmsA30028)
关键词 管道 积灰荷载 垮塌 有限元 pipeline dust load collapse finite element
  • 相关文献

参考文献1

二级参考文献9

  • 1陆新征,张炎圣,江见鲸.基于纤维模型的钢筋混凝土框架结构爆破倒塌破坏模拟[J].爆破,2007,24(2):1-6. 被引量:22
  • 2.GB50010-2002,混凝土结构设计规范[S].北京:中国建筑工业出版社,2002..
  • 3GB50009-2001,建筑结构荷载规范[S].北京:中国建筑工业出版社,2001.
  • 4Ellingwood Bruce R. Mitigating risk from abnormal loads and progressive collapse [ J ]. Journal of Performance of Constructed Facilities, 2006,20 (4) : 315-323.
  • 5BS 8110-1:1997,Structural use of concrete: part 1: Code of practice for design and construction [S]. London:British Standards Institution, 1997.
  • 6Draft prEN 1991-1-7, Eurocode 1-actions on structures,part 1-7: general actions-accidental actions[S]. Brussels: European Committee for Standardization, 1991.
  • 7GSA2003, Progressive collapse analysis and design guidelines for new federal office buildings and major modernization proiect [ S ]. US Gerneral Setvices Administration, 2003.
  • 8UFC 4-023-03, Design of structures to resist progressive collapse [ S]. Unified facilities Criteria, 2005.
  • 9JOHN A, ALAIN M, GARY P. Study of mitigation strategies for progressive collapse of a reinforced concrete commercial building [ J ]. Journal of Performance of Constructed Facilities, 20 (4): 384- 390.

共引文献36