期刊文献+

常熟市横泾塘东泵闸枢纽工程选址与总体布置的研究 被引量:4

Study on Site Selection and Overall Arrangement of Hengjingtang East Pump Gate Project in Changshu City
下载PDF
导出
摘要 泵闸工程是防洪、排涝的重要水利工程。为确保充分发挥其功用,合理的选址及总体布置尤为重要。本文首先叙述泵闸工程选址及布置的基本原则,而后对常熟市横泾塘东枢纽泵闸枢纽工程的选址及总体布置进行分析。 The pump gate project is an important water conservancy project for flood control and drainage. In order to ensure the full use of its functions, reasonable site selection and overall layout are particularly important. This paper first describes the basic principles of site selection and layout of pump gates, and then analyzes the site selection and overall layout of the pump gate project of Hengjingtang East Hub in Changshu City.
作者 韩文君 HAN Wen-jun(Shanghai Youwei Engineering Design Co.,Ltd.,Shanghai 200093,China)
出处 《价值工程》 2019年第11期88-90,共3页 Value Engineering
关键词 泵闸工程 地址选择 总体布局 pump gate engineering address selection overall layout
  • 相关文献

参考文献3

二级参考文献14

共引文献19

同被引文献20

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部