摘要
本文依托白山大桥连续梁合拢段施工项目,对连续梁合拢段施工技术进行了分析及研究。详细阐述了合拢段气温变化时轴力计算、降低轴力措施、劲性骨架设计、临时锁定方案、施工配重方案、施工要点等,为其它项目连续梁的合拢段施工提供参考作用。
Based on the construction project of the continuous beam closing section of Baishan Bridge, this paper analyzes and studies the construction technology of the continuous beam closing section. The axial force calculation, the reduction measures of axial force, the stiff skeleton design, the temporary locking scheme, the construction weight scheme and the construction points are discussed in detail in the closed section temperature, which provides reference for the construction of the continuous beam of other projects.
作者
肖海龙
XIAO Hai-long(China Railway No.17 Bureau Group Fourth Engineering Co.,Ltd.,Chongqing 401121,China)
出处
《价值工程》
2019年第11期102-104,共3页
Value Engineering
关键词
悬浇连续梁
合拢段施工
劲性骨架设计
临时锁定
continuous casting continuous beam
construction of closed section
design of stiff skeleton
temporary locking