期刊文献+

高堆磷石膏尾矿坝扩容加固措施研究

Research and development measures for expansion and reinforcement of high-rise phosphogypsum tailings dam
下载PDF
导出
摘要 研究了对尾矿磷石膏坝扩容堆高过程的工程特性,总结了我国尾矿坝扩容堆高关键技术和抗震加固措施.结合云南吴家箐磷石膏尾矿坝工程特点和扩容加固经验,分析了多种磷石膏尾矿坝扩容加固措施(降低坝体浸润线、碎石桩、加筋结构、改善筑坝工艺、改变坡面)的抗震性能,提出了一种磷石膏尾矿坝综合扩容加固措施. This paper studied on engineering characteristics of the process of expanding the reactor height of tailings phosphogypsum dam,the key technologies and seismic strengthening measures for the expansion of the tailings dam in China were summarized.Combining the characteristics of Yunnan Wujiayu phosphogypsum tailings dam project and experience in capacity expansion and reinforcement,the seismic performance of various phosphate gypsum tailings dam expansion and (reducing the dam body saturation line,gravel pile,reinforced structure,improving dam construction,changing the slope) reinforcement measures was analyzed.A comprehensive expansion and reinforcement measures for phosphogypsum tailings dam were proposed.
作者 王盛 谢建斌 赵一锦 孙孝海 王卓蕾 WANG Sheng;XIE Jian-bin;ZHAO Yi-jin;SUN Xiao-hai;WANG Zhuo-lei(School of Architecture and Urban Planning,Yunnan University,Kunming 650501,China)
出处 《哈尔滨商业大学学报(自然科学版)》 CAS 2019年第2期208-213,共6页 Journal of Harbin University of Commerce:Natural Sciences Edition
基金 国家自然科学基金资助项目(11862024 51264037)
关键词 尾矿坝 流固耦合 可靠度 动力响应 加固措施 tailings dam fluid-structure coupling reliability dynamic response reinforcement measures
  • 相关文献

参考文献9

二级参考文献50

共引文献238

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部