摘要
对某一区域进行水文地质调查通常会对该区域进行水文调查,物理勘探,钻探和必要的水质监测等技术手段。通过对江苏某固废填埋场场区现场水文地质调查、地质雷达钻探及抽水试验等结果分析,总结分析该厂区水文地质情况,并根据现场情况对场区涌水量进行了估算及后续截排水措施建议。
Hydrogeological investigation of a region often carry out hydrographic surveys in the region,the physical exploration,drilling and the necessary water quality monitoring and other technical means.Based on the results of hydrogeological survey,drilling and pumping tests of geological radar in a solid waste landfill site in jiangsu province,the hydrogeological conditions of the site were summarized and analyzed.Summarize and analyze the hydrogeological conditions of the plant area,and estimate the amount of water inflow from the site according to the site conditions and suggestions for subsequent interception and drainage measures.This paper can provide reference for similar programs hydrographic survey project.
作者
吴礼浩
李磊
权芹钢
尹灵强
汪兵
WU Li-hao;LI Lei;QUAN Qin-gang;YIN Ling-qiang;WANG Bing(No.3 Geological Brigade of Jiangsu Bureau of Geology and Mineral Resource,Zhenjing Jiangsu 212001 China;Jiangsu Geological Foundation Piles Engineering Company,Zhenjiang Jiangsu 21200 China)
出处
《江苏建筑》
2019年第2期103-106,共4页
Jiangsu Construction
关键词
固废填埋场
地质雷达
钻探
抽水试验
水文地质调查
solid waste landfill yard
geological radar
drilling
pumping test
hydrogeological survey