装配式城市高架桥预制桥墩、桥梁的运输方法 被引量:11

Transportation Method for Precast Pier and Beam of Prefabricated Urban Viaduct
下载PDF
导出
摘要 上海嘉闵高架路(G2—S6)JMB2-4标段采用预制装配式工艺施工,为解决大型预制桥墩、桥梁从工厂至施工现场的运输问题,针对预制立柱与预制盖梁的结构特点,分别进行研究,从而形成了一种安全可靠的运输方法,为装配式桥梁预制桥墩、桥梁的运输提供了经验参考。 The Prefabricated construction is adopted for JMB2-4 section of Shanghai Jia-Min Viaduct (G2-S6). In order to solve the problem of transporting factory precast large piers and beams to construction site, according to the research of structural characteristics of columns and prefabricated bent caps, a safe and reliable transportation method is developed, which can provide experience references for the transportation of precast piers and beams of prefabricated bridges.
作者 郑晏华 ZHENG Yanhua(Shanghai Construction No.4 (Group) Co., Ltd., Shanghai 201103, China)
出处 《建筑施工》 2019年第3期354-355,共2页 Building Construction
关键词 装配式高架桥 预制桥墩 预制桥梁 运输方法 专用吊架 运梁托架 prefabricated viaduct precast pier precast beam transportation method special han ger beam carrier
  • 相关文献

参考文献3

二级参考文献9

共引文献30

同被引文献65

引证文献11

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部