摘要
在高层以及超高层建筑施工中,大型垂直运输机械的选择与安装极其重要。在施工方案设计中,先于建筑筏板基础施工塔吊基础作为一项技术创新,为工程的垂直运输及早投入使用,亦为建设工期提供了保证。通过某工程的实际运用,介绍了电梯井基础与塔吊基础一体化施工的经验。
The selection and installation of large vertical trmnsport machinery is extremely important for the construction of high-rise and super-high-rise buildi ngs. As a tech no logical inno vation in the design of construction scheme, the construction of tower crane foundation prior to raft foundation, not only can provide early operation of vertical transportation of the project, but also can guarantee the construction period. The integrated construction experience of the elevator shaft foundation and the tower crane foundation is introduced by the practical application of a project.
作者
何云志
徐登峰
刘国全
HE Yunzhi;XU Dengfeng;LIU Guoquan(The Second Construction Engineering Company Ltd. of China Construction Second Engineering Bureau, Shenzhen, Guangdong 518052, China)
出处
《建筑施工》
2019年第3期407-409,共3页
Building Construction
关键词
筏板基础
动臂塔吊
深基坑
电梯井基础
一体化施工
raft foundation
movable arm tower crane
deep foundation pit
elevator shaft foundation
integrated construction