莱钢1000m^3高炉降低生铁成本实践

Practice of Reducing Pig Iron Cost in Laigang 1 000m^3 Blast Furnace
下载PDF
导出
摘要 炼铁系统能耗占钢铁生产总能耗的60%,莱芜分公司炼铁厂积极响应公司"运营转型、精益管理"的号召,开展精益运营活动。通过提高成本意识,加强了成本管控,优化配矿结构、降低燃耗成本、降低生铁含硅量等措施,使炼铁厂降成本攻关取得一定进步。截止2018年7月,生铁完全成本比行业平均水平低86.9元/t。 The energy consumption of the iron making system accounts for 60% of the total energy consumption of the iron and steel industry,Laiwu Iron Works responds to the call of "Operation Transformation and Lean Management" and carries out lean operation activities. Through improving cost consciousness, strengthening cost control, optimizing ore mixing structure, reducing burning cost and silicon content in pig iron, some progress has been made in tackling key problems of cost reduction in iron-making plants. As of July 2018, the total cost of pig iron was 86.9 yuan/t lower than the average level of the industry.
作者 王丰巧 焦敏 WANG Feng-qiao;JIAO Min(Shandong Iron and Steel Co. Ltd., Laiwu Branch Iromvorks, Laiwu 271104,China)
出处 《甘肃冶金》 2019年第2期20-22,共3页 Gansu Metallurgy
关键词 高炉 炼铁 成本 blast furnace to smelt iron cost
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部