期刊文献+

大断面公路隧道施工方案优化

Optimization of Construction Scheme for Large Section Highway Tunnel
下载PDF
导出
摘要 从理论或实践的角度考虑,大断面公路隧道工程建设难度较大,易出现一系列的施工问题,影响工程建设效果。所以,优化大断面公路施工方案,更加科学、合理、规范、安全、高效的展开隧道施工是非常必要的。结合实际案例,着重分析和探讨如何优化大断面公路隧道施工方案。 From both theoretical and practical point of view,the construction of large cross-section highway tunnel is relatively difficult,and a series of construction problems are easy to occur,affecting the construction effect.Therefore,it is very necessary to optimize the construction scheme of large cross-section highway and launch tunnel construction more scientifically,rationally,normatively,safely and efficiently.Based on this,combined with practical cases,this paper focuses on the analysis and discussion of how to optimize the construction scheme of large cross-section highway tunnel.
作者 胡宇 Hu Yu
出处 《建筑技术开发》 2019年第5期112-113,共2页 Building Technology Development
关键词 大断面公路 隧道施工 施工工艺 施工方案 large cross-section highway tunnel construction construction technology construction scheme
  • 相关文献

参考文献7

二级参考文献42

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部