核电工程全厂全范围总承包管理模式探讨 被引量:1

Discussion on the Whole-range General Contracting Management Mode of Nuclear Power Project
下载PDF
导出
摘要 随着核电工程项目的逐渐发展,核电工程的全厂全范围总承包管理模式正在逐渐完善,因此我们需要对核电工程全厂全范围总承包的管理模式进行有效的分析和探讨,并结合其特点分析该管理模式需要具备的基本条件,从而实现核电工程全厂全范围总承包模式的有效应用。 With the gradual development of nuclear power projects,the whole-plant general contracting management mode of nuclear power projects is gradually improving.Therefore,we need to effectively analyze and discuss the whole-plant general contracting management mode of nuclear power projects,and analyze the basic conditions that the management mode needs to meet in combination with its characteristics,so as to realize the effective application of the whole-plant general contracting mode of nuclear power projects.
作者 吴伟雄 钟航 Wu Weixiong;Zhong Hang(Protection Support Division of Health Physics Department of Fujian Fuqing Nuclear Power CO.,LTD.,Fujian,350318)
出处 《当代化工研究》 2019年第4期36-37,共2页 Modern Chemical Research
关键词 核电工程 全厂全范围 总承包 管理模式 nuclear power engineering the whole range of the plant general contracting management mode
  • 相关文献

参考文献3

二级参考文献12

共引文献5

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部