期刊文献+

浅谈发电厂内制氢站电气防爆设计 被引量:2

Electrical Explosion-Proof Design for Hydrogen Generation Plant of Power Station
下载PDF
导出
摘要 由于发电厂的制氢站大多数存在火灾与爆炸的风险,因而制氢站的安全与发电厂的稳定运行有着密切的联系。根据制氢站对于防爆的特别要求,本文主要以国内某制氢站为例,阐述了发电厂制氢站照明、电缆敷设、防雷及接地、防火封堵等电气部分的设计方法,综合工程设计标准与施工标准,以及设计中的关键问题。 Many hydrogen generation plant of the power station may have fire disaster risk and explosion risk;therefore,the safety of hydrogen generation plant is closely related to the stable operation of the power station.Basing on special requirements on explosion-proof of hydrogen generation plant and taking an example of a domestic hydrogen generation plant,this paper states the design method of electrical parts such as illumination,cable laying,anti-thunder and earthing,fire-proof sealing andetc.The paper also synthesizes engineering design standard,construction standard,as well as key issues in design.
作者 蒋航 孙磊 刘育 JIANG Hang;SUN Lei;LIU Yu(Dadu River Hydropower Development Co.,LTD,Chengdu,Sichuan,610041)
出处 《四川水力发电》 2019年第2期116-119,125,140,共6页 Sichuan Hydropower
关键词 发电厂 氢气来源 制氢站 风险区域 设计要点 power station hydrogen source hydrogen generation plant risky area key issues of design
  • 相关文献

参考文献3

二级参考文献4

  • 1[1]DL/T 5068-1996,火力发电厂化学设计技术规程[S].
  • 2[2]GB 50177-93,氢氧站设计规范[S].
  • 3陈龙.关于管道输氢系统设计的讨论[J].电力设计水处理技术,1999,(1).
  • 4吴怡卫.外购瓶装氢供氧设计方案的探讨[J].电力设计水处理技术,2001,(3).

共引文献8

同被引文献16

引证文献2

二级引证文献1