期刊文献+

基于系统动力学的第三方物流企业成长与投资不足分析——以飓风物流为例 被引量:1

Analysis on the Growth and Inadequate Investment of Third Party Logistics Enterprises Based on System Dynamics——Take Jufeng Logistics as an Example
下载PDF
导出
摘要 文中通过构建第三方物流企业成长与投资不足的系统动力学模型,针对丹阳飓风物流有限公司的信息化建设水平和客服人员服务能力无法跟上企业发展速度的问题,在不考虑企业业务能力水平的条件下,通过模型对飓风物流公司进行仿真、检验,并根据仿真模拟结果,探讨第三方物流企业在成长时应采取的策略。最终实现将信息技术与人工服务相结合,提升服务效率与降低服务成本。 This paper constructs a system dynamics model of the growth and underinvestment of the third party logistics enterprises,aiming at the problem that the informatization construction level and the service ability of customer service personnel of Danyang Hurricane Logistics Co.,Ltd.can not keep up with the development speed of enterprises,without considering the level of business ability of enterprises,simulates and tests the hurricane logistics company through the model,and concludes the simulation results according to the simulation results.As a result,this paper explores the strategies that third-party logistics enterprises should adopt when they grow up.Finally,it will combine information technology with manual service,improve service efficiency and reduce service cost.
作者 杨心怡 王海燕 潘梦云 孟婷 YANG Xin-yi;WANG Hai-yan;PAN Meng-yun;MENG Ting(School of Management,Jiangsu University,Zhenjiang 212013,China)
出处 《物流工程与管理》 2019年第4期53-56,共4页 Logistics Engineering and Management
基金 江苏大学2018年度大学生实践创新训练项目 项目编号:201810299171H
关键词 系统动力学 第三方物流 客户服务 企业信息化建设 system dynamics third-party logistics customer service enterprise informationization construction
  • 相关文献

参考文献2

二级参考文献26

  • 1宁晓倩,王其藩.运用系统动力学模型进行项目时间/成本估算[J].科技导报,2004,22(9):54-57. 被引量:9
  • 2罗辉道,项保华.资源概念与分类研究[J].科研管理,2005,26(4):99-104. 被引量:32
  • 3Lorant A. Tavasszy, Bas Groothedde, Cees Ruijgok (2000), Agg, regate Models of Spatial Logistics. Paper prepared for the IMRL 2000 Conference, May 2000.
  • 4Wilson, A.G. (1998), Land-use/Transport Interaction Models, Past and Future, Journal of Transport Economics and Policy, Volume 32, Part 1, January 1998.
  • 5Dennis Rondinelli, Michael Berry (2000), Multimodal transportation, logistics, and the environment: managing interactions in a global economy, European Management Journal, Volume18, Issue 4 398-410.
  • 6KatSuhiko Ogata.《系统动力学》[M].机械工业出版社,2004.
  • 7Vaziri K,Carr P,Nozick L. Project planning for con-struction under uncertainty with limited resources [J],Journal of Construction Engineering and Management,2007,133(4): 268-276.
  • 8Afshar-Nadjafi B, Majlesi M. Resource constrained pro-ject scheduling problem with setup times after preemp-tive processes[J], Computers &- Chemical Engineering,2014,69: 16-25.
  • 9Browning T, Yassine A. Resource-constrained multi-project scheduling: Priority rule performance revisited[J]. International Journal of Production Economics,2010,126(2):212-228.
  • 10Lim A, Ma Hong, Rodrigues B,et al. New conceptsfor activity float in resource-constrained project manage-ment[J]. Computers Operations Research,2011,38(6): 917-930.

共引文献51

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部