摘要
介绍了国外某铜冶炼厂在改造扩建过程中面临的设计难点及处理方法 ,详细分析了设计中的技术创新点和实施结果。通过精心设计,使项目得以按时按质顺利投产,各项技术经济指标均达到或接近世界闪速炼铜工厂的先进水平。
This paper introduces the design difficulties and treatment methods faced by a foreign copper smelter in the upgrading and expansion, and analyzes technological innovations of the design and its implementation results in detail. Through the elaborate design, the project can be put into operation successfully on time and quality, and all technical and economic indicators have reached or approached the advanced level of the world flash copper smelters.
作者
刘建军
LIU Jianjun(China Nerin Engineering Co. Ltd., Nanchang, Jiangxi 330038, China)
出处
《有色冶金设计与研究》
2019年第2期22-26,共5页
Nonferrous Metals Engineering & Research
基金
2016年江西省创新驱动"5511"工程(项目编号:2016AB(28005)
关键词
铜冶炼厂
扩建改造
设计难点
技术创新
copper smelter
expansion & upgrading
design difficulties
technological innovations