期刊文献+

基于改进迭代算法的动态调度优化模型 被引量:1

Dynamic Scheduling Optimization Model Based on Improved Iterative Algorithm
下载PDF
导出
摘要 笔者针对当前智能加工系统中的动态作业调度问题,考虑作业工序、等待时间等实际情况中产生的约束条件,在3大原则的前提下,应用改进迭代算法建立了一道工序的工作调度模型和两道工序的调度模型,通过验证模型的时间空间复杂度,得出此模型具有较好的实用性。最后,在模型的推广中加入1%的工作故障概率,得到故障概率分布,进而得到更加稳定的模型。 This paper is aimed at the problem of dynamic job scheduling in current intelligent processing systems. Considering the constraints generated in the actual situation such as the operation process and waiting time, under the premise of the three principles, the improved iterative algorithm is applied, and the work scheduling model of one process and the scheduling model of the two processes are established. By verifying the time complexity of the model, it is concluded that the model has good practicability.Finally,a 1% work failure probability is added to the model's promotion, and the fault probability distribution is obtained, which leads to a more stable model.
作者 肖添 Xiao Tian(College of Science, Hainan University, Haikou Hainan 570228, China)
机构地区 海南大学理学院
出处 《信息与电脑》 2019年第7期44-45,共2页 Information & Computer
关键词 动态规划 作业调度 改进迭代算法 FCFS 原则 dynamic programming job scheduling improved iterative algorithm FCFS principle
  • 相关文献

参考文献3

二级参考文献21

  • 1熊光楞,徐晓萍.计算机仿真在制造车间运行中的应用[J].计算机仿真,1996,13(3):43-49. 被引量:7
  • 2郑华林,刘飞,熊峰,尹超.一种新型单件小批量生产车间调度方法.www.863cims.net.2002.
  • 3黄德才,钱能.基于JIT的一类零件排序问题通用模型及解法.www.863cims.net.2002.
  • 4王万良,吴启迪.基于Hopfield神经网络求解作业车间调度问题新方法.www.863cims.net,2002.
  • 5何霆,刘文煌,梁力平.基于进化算法的一类作业车间调度.http://www.863cims.net.2002.
  • 6陈雄,孔庆生,吴启迪.混合算法求解Job—Shop调度问题.Proceedings of the 4th World Congress on Intelligent Control Automation Junc 10-14,2002,Shanghai,P.R.China 1739~1743.
  • 7Jose Femando Gon?alves,Jorge Jose de Magalh? es Mendes,Mauricio G.C. Resende. A Hybrid Genetic Algorithm for the Job Shop Scheduling Problem.AT&T Labs Research Technical Report TD-SEAL6J, September 2002.
  • 8Nakasuka S,YoshidaT.Dynamic Scheduling System Utili Zing Machine Learning as a Knowlege Acquisition Tool.Int J.Prod.Res.992,30(2).
  • 9Wang L C, Chen H M, Liu C M.Intelligent Scheduling of FMS with Inductive Learning Capability Using Neural Networks. Int. J. FMS, 1995,7.
  • 10Lee C Y, Piramuthu S,Tsai Y K. Job-Shop Scheduling with a Genetic Algorithm and Machine Learning. Int. J. Prod.Res. 1997,35 (4).

共引文献6

同被引文献25

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部